Dynamic Project Interdependencies (PI) in Optimizing Project Portfolio Management (PPM)

Dynamic Project Interdependencies (PI) in Optimizing Project Portfolio Management (PPM)

Title: Dynamic Project Interdependencies (PI) in Optimizing Project Portfolio Management (PPM)
Rahayu S. Arifin, Setyo Sarwanto Moersidik, Edhi Tri Budi Soesilo, Djoko M. Hartono, Yusuf Latief

Corresponding email:


Published at : 30 Dec 2015
Volume : IJtech Vol 6, No 5 (2015)
DOI : https://doi.org/10.14716/ijtech.v6i5.1209

Cite this article as:

Arifin, R.S., Moersidik, S.S., Soesilo, E.T.B., Hartono, D.M., Latief, Y., 2015. Dynamic Project Interdependencies (PI) in Optimizing Project Portfolio Management (PPM). International Journal of Technology. Volume 6(5), pp. 828-837



767
Downloads
Rahayu S. Arifin Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Depok 16424, Indonesia
Setyo Sarwanto Moersidik Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Depok 16424, Indonesia
Edhi Tri Budi Soesilo Graduate Program of Environmental Science, Universitas Indonesia, Jl. Salemba Raya No.4, Jakarta Pusat 10430, Indonesia
Djoko M. Hartono Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Depok 16424, Indonesia
Yusuf Latief Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Depok 16424, Indonesia
Email to Corresponding Author

Abstract
Dynamic Project Interdependencies (PI) in Optimizing Project Portfolio Management (PPM)

Many researchers assess the tools and techniques to optimize the project portfolio management. Most of those tools treat each project within a portfolio as an independent entity. Starting in 2010 onwards, many researchers considered the importance of Project Interdependencies (PI) in defining the Project Portfolio (PP); however, those researchers treated PI as a static condition. Organization strategy has dynamic characteristics caused by internal dynamics as well as external forces. Since the PP is a bridge between organization strategy and the program/project, the PP has to have a dynamic ability, in order to support the organizational strategy dynamics. This research applies an interactive approach using System Dynamics (SD) modelling to represent the PI dynamics as well as a project selection tool/technique within a project portfolio. A case study was conducted with the Bandung Urban Waterworks (PDAM Tirtawening). The outcomes of this research suggest that the model developed by the SD approach is: 1) one of the tools and techniques is to specify the PI dynamics; 2) to determine project priority in order to optimize the project portfolio. SD approach has the ability to challenge an organization’s perception of their project portfolio interdependencies and to enhance strategic decision making capabilities. PI on this research is driven by project outcomes. PI that driven by other reasons, such as by market, resources, knowledge, etc., should be leveraged more, to figure out a complete picture of the PI importance within Project Portfolio Management (PPM).

PDAM Tirtawening Bandung, Project interdepencies, Project Portfolio Management, System dynamics

References

Archer, N.P., Ghasemzadeh, F., 1999. An Integrated Framework for Project Portfolio Selection. International Journal of Project Management, Volume 17(4), pp. 207–216

Blecic, I., Cecchini, A., Pusceddu, C., 2008. Constructing Strategies in Strategic Planning: A Decision Support Evaluation Model. Oper Res International Journal, pp. 153–166

BPKP, 1995–2010. Performance Audit – Annual Report, Bandung Municipal Public Waterworks (in Bahasa)

Cooper, G., 2001. Portfolio Management for New Product Development: Results of an Industry Practices Study. Stage-Gate International and Product Development Institute Inc.

Danilovic, M., Sandkul, B., 2005. The Use of Dependence Structure Matrix and Domain Mapping Matrix in Managing Uncertainty in Multiple Project Situations. International Journal of Project Management, Volume 23(3), pp. 193–203

Engwall, M., Jerbrant, A., 2003. The Resource Allocation Syndrome: The Prime Challenge of Multi-project Management. International Journal of Project Management, Volume 21(6), pp. 403–409

Formentini, M., 2011. Using Value Analysis to Support Knowledge Transfer in the Multi-project Setting. International Journal of Production Economics, Volume 131(2), pp. 545–560

Killen, C., Kjaer, C.K., 2012. Understanding Project Interdependencies: Exploring the Role of Visual. International Journal of Project Management, Volume 30(5), pp. 554–566

Lechler, T., Teichert, T., 2006. The Hidden Risks of Structural NPD Portfolio Inconsistencies: Experiences from an International Joint Venture. Technology Management for the Global Future, PICMET 2006, Volume 6, pp. 2661–2669

Lee, J.W., Kim, S.H., 2001. An Integrated Approach for Interdependent Information System Project Selection. International Journal of Project Management, Volume 19(2), pp. 111–118

Lycett, M., Rassau, A., Danson, J., 2004. Programme Management: A Critical Review. International Journal of Project Management, Volume 22(4), pp. 289–299

Platje, A., Seidel, H., Wadman, S., 1994. Project and Portfolio Planning Cycle: Project-based Management for the Multiproject Challenge. International Journal of Project Management, Volume 12(2), pp. 100–106

PMBOK, 2013. Project Management Body of Knowledge, 5th Edition. Newton Square, Pennsylvania: Project Management Institute Inc

PMI, 2013. Project Portfolio Management Third Edition. Pennslyvania: Project Management Institute

Reyck, B.D., Grushka-Cockaynea, Y., Lockett, M., Calderini, S.R., Moura, M., Sloper, A., 2005. The Impact of Project Portfolio Management on Information Technology Project. International Journal of Project Management, Volume 23(7), pp. 524–537

Rungi, M., Hilmola, O-P., 2011. Interdependency Management of Projects: Survey Comparison between Estonia and Finland, Baltic Journal of Management, Volume 6(2), pp. 146–162

Soderlund, J., 2004. On the Broadening Scope of the Research on Projects: A Review and a Model for Analysis. International Journal of Project Management, Volume 22(8), pp. 655–667

Soesilo, Kurniawan, 2014. Pemodelan System Dynamics. Jakarta: Lembaga Penerbit Fakultas Ekonomi Universitas Indonesia

Srijariya, W., Riewpaiboon, A., Chaikledkaew, U., 2008. System Dynamic: An Alternative Method of Budgeting. Value in Health, Volume 11, Supplement 1, pp. S115–S123

Sterman, J.D., 2000. Business Dynamics: Systems Thinking and Modelling for a Complex World. McGraw Hills Company Inc, USA

Tasevska, F., Toropova, O., 2013. Management of Project Interdependencies in a Project Portfolio. Thesis. Umeå School of Business and Economics, Umeå Universitat

Teller, J., Kock, A., 2013. An Empirical Investigation on How Portfolio Risk Management Influences in Project Portfolio Success. International Journal of Project Management, Volume 31(6), pp. 817–829

Thiry, M., 2004. ‘‘For DAD’’: A Programme Management Life-cycle Process. International Journal of Project Management, Volume 22(3), pp. 245–252

Winz, I., Brierley, G., 2010. The Use of System Dynamics Simulation in Integrated Water Resources Management. Private Bag 92019, Auckland, New Zealand: School of Geography, Geology and Environmental Science University of Auckland

Zuluaga, A., Sefair, J.A., Medaglia, A.L., 2007. Model for the Selection and Scheduling of Interdependent Projects. Systems and Information Engineering Design Symposium, SIEDS 2007. IEEE, pp. 1–7